January 30, 2024

Cutting Edge Pool Design and Outdoor Living Spaces

1.6 min read| Published On: January 30th, 2024|

By AkersArt

Cutting Edge Pool Design and Outdoor Living Spaces

1.6 min read| Published On: January 30th, 2024|

When you’ve made the decision to put in a new pool, the last thing you want to hear is that it’s going to take one to two years.

Cayman Pool Construction & Service assures you that this isn’t  the case. With more than 30 years  of work in The Villages, the locally owned business has built a reputation for skilled work and top-notch customer service.

“We can, under normal conditions, complete a pool in nine months after signing, allowing six to eight weeks for ARC approval, engineering, and permitting,” says Scott Bowlin,  owner of Cayman Pool Construction & Service.

It doesn’t take a large deposit to build your pool. The company offers a twelve-draw contract designed to keep pace with the construction as it is completed rather than taking large sums up front. 

“All of our pools are in-ground concrete with a plaster finish. We use a plaster company that has been in business for 35 years and warranty their plaster for five years,” says Scott. 

Cayman offers custom designs tailored to each specific customer’s needs.

That can mean a lap pool, a large pool spa combo where the spa can be heated during use and recirculated into the pool afterward, or even a small “spool” – a smaller pool that doubles as a spa.

In addition to extensive experience with pool construction, the company is a full-service outdoor living contractor. 

“We also build summer kitchens, which we custom design, and can do partial or full lanai enclosures to provide a climate adjustable sitting area that is also part of the pool deck,” notes Scott.

Cayman Pool Construction & Service is a multi-licensed company and has its own state-certified electrical, pool and building contractor’s licenses. They’re the only pool company in the area that carries all three licenses.

If your existing pool needs a facelift, Cayman Pools has the answer. They can refurbish the pool when the finish needs to be replastered or retiled. This adds many years to the pool’s life for a fraction of the cost of new construction. Changing out the pump and electrical equipment on a 20-year-old pool may make it feel brand new.

Dreaming of your new pool? Call today! There’s no waiting period for your initial consultation.

“We’ll arrange for someone to  come out within days of your call,” says Scott.!

“We can, under normal conditions, complete a pool in nine months after signing, allowing six to eight weeks for ARC approval, engineering, and permitting.”

—Scott Bowlin, Owner 

Leave A Comment

About the Author: AkersArt

Share This Story!

Never miss an issue,  Sign up for the Style Newletter!